节点文献

八渡车站碎石土地层中长锚索施工技术

CONSTRUCTION TECHNIQUES OF LONG ANCHOR CABLE IN GRAVEL SOIL OF BADU STATION

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 赵红玲张勇张福明

【Author】 ZHAO Hongling1,ZHANG Yong2,ZHANG Fuming2(1.Xi’an University of Architecture and Technology,Xi’an,Shaanxi 710055,China;2.The Third Research Institute of Engineering,General Staff of PLA,Luoyang,Henan 471023,China)

【机构】 西安建筑科技大学总参工程兵科研三所总参工程兵科研三所 陕西西安710055河南洛阳471023

【摘要】 随着我国经济建设的飞速发展,各类岩土加固工程中锚固技术的应用日益广泛。大量工程实践已经证明锚固技术的经济性和先进性。但是,锚固工程常遇到各类不良地层(例如塌积、残积、坡积和崩积层等碎石土地层),在锚固施工的钻孔中由于严重的塌孔、卡钻,给施工带来很大困难,同时也给锚固工程质量带来隐患。通过工程实践和大量试验,研究组合式钻具钻孔方法,较好地解决在上述地层中的成孔问题,提高施工速度。结合南宁—昆明铁路八渡车站的锚索施工,介绍复杂地层中锚固工程施工的技术措施和应注意的有关技术问题。

【Abstract】 With the rapid development of economy in China,the anchorage techniques are applied widely to various kinds of geotechnical reinforcement engineering.Its economical efficiency and advantage have been proved by a lot of engineering practices.But in many reinforcement projects,some unfavourable geological conditions are encountered frequentlys,uch as colluvial soilr,esidual soils,lope wash,etc.,which result in collapse of borehole and clip of bore rod during drilling of borehole that will bring considerable difficulties to construction and many incipient faults for construction quality.A drilling technique using combined drilling tools is developed via several tests and practices,which well solve the problem about borehole drilling in some strata mentioned above and improve the construction speed.According to the construction of anchor cable in the landslide reinforcement of Badu Station along Nanning—Kunming Railway,some technical measures for construction in unfavourable geological conditions and some technical issues are introduced.

【关键词】 土力学碎石土锚固钻孔边坡加固
【Key words】 soil mechanicsgravel soilanchorageboreholeslope reinforcement
  • 【文献出处】 岩石力学与工程学报 ,Chinese Journal of Rock Mechanics and Engineering , 编辑部邮箱 ,2007年S1期
  • 【分类号】TU753.8
  • 【被引频次】7
  • 【下载频次】221
节点文献中: 

本文链接的文献网络图示:

本文的引文网络