Based on summarizing experiences in design,manufacture,and operation of the first home-made 100 MW circulating fluid- ized bed (CFB) boiler,a 210 MW CFB boiler has been developed.Results of practical operation show that the performane parameters of the developed boiler have been reached the designed values,rate of automatically putting the unit into operation to be 87.3%.suc- cessfully putting the home-made 210 MW CFB boiler into service has laid a solid foundation for the home-made 330 MW CFB boiler being ...