节点文献

凡口铅锌矿矿柱回采稳定性数值模拟研究

Numerical Simulation of Ore-pillar Stability during Its Exploitation in Fankou Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 杨彪罗周全刘晓明刘望平吴亚斌张木毅黄沛生许毓海曹胜祥

【Author】 Yang Biao1,Luo Zhouquan1,Liu Xiaoming1,Liu Wangping1,WuYabin1,Zhang Muyi2,Huang Peisheng2;Xu Yuhai2,Cao Shengxiang2(1.School of Resources and Safety Engineering,Central South University,Changsha,Hunan 410083,China;2.Fankou Lead-Zinc Mine,Shaoguan, Guangdong 512325,China)

【机构】 中南大学资源与安全工程学院中金岭南凡口铅锌矿中金岭南凡口铅锌矿 湖南长沙410083湖南长沙410083广东韶关市512325

【摘要】 通过运用加拿大rocscience研究所研发的二维有限元数值模拟软件Phase2对凡口铅锌矿较典型的N4-5采场逐步进行了动态模拟分析。通过分析,准确模拟了采场回采过程中的应力分布及位移变化情况,为优化采场结构参数和指导地压控制提供了可靠的依据。

【Abstract】 The dynamic simulation analysis of exploitation course of typical stope N4-5 was carried out using two-dimensional finite element software Phase2 developed by Rocscience Institute of Canada.The surrounding stress distributing and displacement of the stope during mining the ore pillar of N4-5 stope were accurately simulated and analyzed,it offered dependable bases for optimizing the structural parameters of stope and guiding the ground pressure control.

  • 【文献出处】 矿业研究与开发 ,Mining Research and Development , 编辑部邮箱 ,2007年05期
  • 【分类号】TD862
  • 【被引频次】8
  • 【下载频次】233
节点文献中: 

本文链接的文献网络图示:

本文的引文网络