“半逆作法”在大型深基坑开挖中的应用

SEMI-REVERSE CONSTRUCTION METHOD APPLIED TO THE EXCAVATION OF A LARGE DEEP FOUNDATION PIT

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 庄剑峰谢小松

【Author】 ZHUANG Jianfeng1, XIE Xiaosong2 (1. China Construction First Division Group, 200082 Shanghai, China; 2. School of Civil Engineering, Tongji University, 200092, Shanghai, China)

【机构】 中建一局集团有限公司同济大学土木工程学院 200082上海200092上海

【摘要】 上海仲盛商业中心大型深基坑是目前上海市面积最大的基坑工程,由于该基坑面积大,开挖深、地下水位高,基坑周边邻近建筑物及地下管线多,施工环境复杂,采用"半顺作半逆作"的施工方法,确保了基坑支护结构、周边地下管线和周围环境的安全,取得了较好的效果。

【Abstract】 The large deep pit of Shanghai Zhongsheng Commercial Center is a foundation works of the largest area in Shanghai presently. Considering its large area, deep excavation depth, high groundwater level, dense distribution of surrounding buildings and underground pipelines, as well as the complicated construction environment, semi-reverse construction method was adopted to ensure the safety of the pit support structure, the underground pipelines and the surrounding environment, reaching good effect.

  • 【文献出处】 建筑技术 ,Architecture Technology , 编辑部邮箱 ,2007年12期
  • 【分类号】TU753
  • 【被引频次】8
  • 【下载频次】208
节点文献中: 

本文链接的文献网络图示:

本文的引文网络