青岛海湾大桥栈—Ⅰ工程特殊测量方案及实践
Method of Establishing and Measuring the Control Network for Qingdao Bay Major Bridge Stack-Ⅰ Project
【摘要】 青岛海湾大桥栈—Ⅰ工程是青岛海湾大桥的首期工程。本文介绍了海上控制网的布设及施测方案,给出了浅海测区利用全站仪对打桩船和导向框架打桩的测量方法以及钢管桩桩顶标高的控制方法。实践及施测结果表明,该方法经济,测量精度高,对海上架桥打桩工作具有一定的理论和实践指导意义及应用价值。
【Abstract】 The stack-Ⅰ project is the first phase of Qingdao Bay major bridge engineering.This paper gives the method of establishing and measuring the control network on the sea.It describes the application of total staion in piling boat and piling of leading frame-work and the control method of elevation of the top for the stell tube.Both the practice and the result indicate that this method can get high measuring accuracy and should be very economical and useful for marine bridge engineering in theory and practice.
【关键词】 大桥控制网;
全站仪;
钢管桩;
导向框架;
放样;
【Key words】 bridge control net; total station; peg of steel tube; leading frame-work; layout;
【Key words】 bridge control net; total station; peg of steel tube; leading frame-work; layout;
- 【文献出处】 工程勘察 ,Geotechnical Investigation & Surveying , 编辑部邮箱 ,2007年09期
- 【分类号】U442.2
- 【被引频次】1
- 【下载频次】115