爆破拆除项目的进度与安全管理

STUDY ON PROGRESS & SAFETY MANAGEMENT OF BLASTING DEMOLITION PROJECTS

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李战军刘玲平郑炳旭

【Author】 LI Zhan-jun1,LIU Ling-ping2,ZHENG Bing-xu1(1.Guangdong Handar Blasting Engineering Co.,Ltd,Guangzhou 510623,China;2.Guangdong Safety Administrative Bureau,Guangzhou 510000,China)

【机构】 广东宏大爆破工程有限公司广东省安全生产监督管理局广东宏大爆破工程有限公司 广州510623广州510000广州510623

【摘要】 总结了影响爆破拆除项目进度和安全的主要因素,指出爆破拆除项目的进度和安全目标的实现,首先要进行风险控制;其次要抓住重点,并主次兼顾;同时还要妥善处理项目实施中安全目标与进度目标的矛盾,方能达到预期目的。

【Abstract】 The main factors influencing the progress and safety of blasting demolition projects were summarized,reaching the conclusion that the realization of the schedule progress and safety goal of blasting demolition projects should take the risk control as the priority,and was followed closely by paying much attention to the critical factors.The anticipated blasting goal relied on the proper contradiction between the progress and safety goals.

  • 【文献出处】 工程爆破 ,Engineering Blasting , 编辑部邮箱 ,2007年04期