双回同塔110kV线路绝缘子串带电更换的研究
Study for Live Line Replacing for Insulation Clusters on 110 kV Lines with Two Lines in Parallel on One Tower
【摘要】 针对双回同塔110 kV线路铁塔塔头尺寸小、利用常规带电作业方法难以进行绝缘子更换的难题,研究出了有效的带电作业方法,并研制了作业工具。
【Abstract】 The effective methods of live line work are developed and the effective tools for live line work are made to solve the problems that the size is too short on the tower for live line replacing insulations by conventional method.