节点文献
对《建设项目水资源论证管理办法》附件中《地下水源论证》部分的几点认识
Some Views on Parts of "GRD" of the Attachment of "GRD Management Methods of Construction Projects"
【摘要】 进行建设项目水资源论证是实行取水许可管理的基础和前提,也是水行政主管部门加强水资源管理、促进水资源优化配置的具体措施之一。但将建设项目水资源论证结果服务于可行性研究阶段时,地下水源论证的深度应如何定位?它与供水水文地质勘察之间是一个怎样的关系?本文就此类问题加以探讨。
【Abstract】 Water resource demonstration of construction projects is the foundation and prerequisite of water intaking resource license management;it is also one of the measurements strengthening the management of water resource and promoting its advaoced configuration for water administrative department.How to locate on the depth of the groundwater resource demonstration if the result is used on the feasibility study stage of water resource demonstration? What relationship is it with hydrogeological investigation? The above such similar questions are discussed in this paper.
【关键词】 建设项目;
地下水源论证;
勘察阶段;
水文地质条件;
【Key words】 construction projects; groundwater resource demonstration; investigation phase; hydrogeological conditions;
【Key words】 construction projects; groundwater resource demonstration; investigation phase; hydrogeological conditions;
- 【文献出处】 工程勘察 ,Journal of Geotechnical Investigation & Surveying , 编辑部邮箱 ,2006年09期
- 【分类号】D922.66
- 【被引频次】3
- 【下载频次】131