换热器管子/管板模块试验

Test for the Tube-Tubesheet Mock-Up of Heat-Exchange

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 沈卫中

【Author】 Shen Wei-zhong ( Jiangsu province chemical-industry pressure vessel inspection center 213003 )

【机构】 江苏省锅炉压力容器安全检测中心所 213003

【摘要】 一效~五效换热器管板为爆炸复合板16Mn(Ⅲ级锻件)+90Cu10Ni,管子为90Cu10Ni高通量管,管子管板焊接采用SMAW,结构为传统的端面焊接,管头伸出3mm如图1B,管子管板接头要求100%RT探伤。换热器管子/管板模块试验是施工前的焊工技能评定,参与焊接的每位焊工必须进行。

【Abstract】 The material of explosion cladding plates tube-sheet for the first  ̄ fifth effect re-boiler is 16Mn (Ⅲ forging)+90Cu10Ni,The material of tubes is 90Cu10Ni(high flux tube, UOP offer) , SMAW is applied to tube-tubesheet fillets, joint configuration is the same as fig. 1B, the joints are required to 100% radiograph. It requires that every welder has to weld a mock-up before construction. Every attendee’s ability should be confirmed.

【关键词】 模块高通量管90Cu10NiERCuNi(C71580)
【Key words】 Mock-upHigh flux tube90Cu10NiERCuNi(C71580)
  • 【文献出处】 中国化工装备 ,China Chemical Industry Equipment , 编辑部邮箱 ,2005年03期
  • 【分类号】TK172
  • 【被引频次】1
  • 【下载频次】67