段间蒸汽发生器改造总结

SUMMARY ON THE REVAMPING OF INTER-STAGE STEAM GENERATOR

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘裕蔡斌吴卫民

【Author】 Liu Yu,Cai Bin and Wu Weimin (Jinxi Natural Gas Chemical Co. , Ltd. , Huludao, 125001)

【机构】 锦西天然气化工有限责任公司锦西天然气化工有限责任公司 辽宁 葫芦岛125001辽宁 葫芦岛125001

【摘要】 布朗工艺空气压缩机段间冷却器热负荷过高,造成压缩机段间温度超温,影响压缩机满负荷运行,首次成功地对进口压缩机段间改造,增加段间蒸汽发生器后降低了段间空气温度,满足了压缩机运行工况,又合理利用其余热。

【Abstract】 The heat capacity of inter-stage cooler of the air compressor in ammonia plant (KBR technology process) of Jinxi Natural Gas Chemical Co. , Ltd. was too high, resulting in overheating in the inter-stage, the compressor therefore could not operate at full load. A successful modification to the inter-stage of the compressor has been achieved by adding inter-stage steam generator. This measure allows a reasonable utilization of heat surplus, and decreases the air temperature to satisfy the compressor as well.

  • 【文献出处】 大氮肥 ,Large Scale Nitrogenous Fertilizer Industry , 编辑部邮箱 ,2005年03期