节点文献
某填海工程沉降差异原因分析
Analysis of the Cauce of Differential Settlcment in Seafill Work
【摘要】 在深圳某一填海工程中,算得的沉降量和达到卸载要求时的预压时间与实际情况有较大的差异。根据实测资料和地质资料,对产生差异的原因进行了分析,可供类似工程参考。
【Abstract】 The calculated settlement ot a sea-fill engineering is quite different from the settlement occurred in expcted time of unloading. In the paper, the cause ot differential settlement is analyzed based on the actual data of in-sita observafion and geologieal condition it is considered to be useful for similar works.
- 【文献出处】 土工基础 ,Soil Engineering and Foundation , 编辑部邮箱 ,2005年04期
- 【分类号】TU433
- 【下载频次】113