节点文献
内河挖入式港池减淤措施的试验研究
Experimental Study on Sedimentation-Relieving of Inland Dig-in Basins
【摘要】 针对港池回流引起的泥沙淤积,分别采用水下涵管抽压水、集沙坑、防沙堤等方法进行港池减淤的试验研究。结果表明,三种减淤措施均有较好的减淤效果,在技术上也是可行的,实际工程可结合港池具体情况选用。
【Abstract】 In dealing with the sedimentation caused by the circulating flow,experimental study is performed on the measures of sedimentation relieving: culvert pipe pumping and water pressing,sedimentation basin,and sand preventing dyke.The experimental result shows that the three measures all have good sedimentation-relieving effect and are feasible technically.They can be selected for use considering actual engineering conditions of harbor basins.
【关键词】 挖入式港池;
减淤;
水下涵管抽压水;
集沙坑;
防沙堤;
【Key words】 dig-in basin; sedimentation-relieving; culvert pipe pumping and water pressing; sedimentation basin; sand prevention dyke;
【Key words】 dig-in basin; sedimentation-relieving; culvert pipe pumping and water pressing; sedimentation basin; sand prevention dyke;
【基金】 湖南省教育厅科研资助项目(No.03C071)
- 【文献出处】 水运工程 ,Port & Waterway Engineering , 编辑部邮箱 ,2005年12期
- 【分类号】U657.2
- 【被引频次】5
- 【下载频次】140