节点文献

土卡河水电站厂房坝段应力应变研究

Stress-strain analysis for powerhouse dam section of Tuka Hydropower Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 邹德兵张建海刘麟李长禹

【Author】 ZOU De-bing~1, ZHANG Jian-hai~1, LIU Lin~1, LI Chang-yu~2 (1.School of Hydraulic Engineering, Sichuan Univ., Chengdu 610065, China; 2. Beijing Investigation and Design Institute, State Power Corporation, Beijing 108000, China)

【机构】 四川大学水利水电工程学院国家电力公司北京勘测设计研究院 四川成都 610065四川成都 610065北京 108000

【摘要】 采用数值模拟方法,对土卡河水电站厂房坝段整体混凝土结构及重点部位(进水口、蜗壳、尾水管)和大坝基础进行了应力应变研究.结果表明:坝顶向下游最大位移1 250cm,坝顶最大沉降1 128cm;地震工况下坝趾出现-0 818MPa的拉应力,坝踵在工况6下出现拉应力;蓄水工况下,进水口底部、蜗壳底部、尾水孔周边均存在极值约为-0 5MPa的拉应力.

【Abstract】 Based on the numerical simulation method, a stress-strain and stability analysis was performed on the massive concrete structure and some key parts, including the intake, spiral case, tail pipe, and dam foundation. It is shown that the maximal displacement of the dam top toward downstream is 1.250?cm, the maximal settlement of the dam top is 1.128?cm, the tensile stress occurring in the dam toe is -0.818?MPa in the earthquake case, the tensile stress occurs in the dam heel only in case 6, and the tensile stress with a extreme value of -0.5?MPa exists at the bottom of inlets and spiral cases and the surrounding of tailwater outlets in the impounding case of the reservoir.

  • 【文献出处】 水利水电科技进展 ,Advances In Science and Technology of Water Resources , 编辑部邮箱 ,2005年01期
  • 【分类号】TV731.2
  • 【被引频次】2
  • 【下载频次】48
节点文献中: 

本文链接的文献网络图示:

本文的引文网络