索埃勒平板运输车组在三峡工程中的应用
The Application of Scheuerle platform combination in the Three Gorges Project
【摘要】 三峡工程的重大设备的公路运输都超过了交通部规定的大件运输标准,在我国公路运输业上也是罕见的,其运输车辆选用了索埃勒平板车组。水轮机转轮的运输重为450t,采用6平板组合车组;主变压器运输重为396t,采用4平板组合车组;永久船闸的公路桥预制梁每根重114t,长34.7m,采用了3个平板单元纵向组合的超长车组运输。每项运输都对行车速度、公路坡度、转变半径等进行了计算;均按时、安全地完成了运输任务。
【Abstract】 The highway transportation of the important equipments of The Three Gorges Project all exceeds transportation standard of The Ministry of Communications,which are few and far between carrying trades of our country and attach sets of Scheuerle platform combination.For example ,the turbine runner weights 450 t,that adopt 6 units of platform trailer;main transformer weights 396 t, adopt 4 units of platform trailer;each highway bridge beam of permanent navigation lock weights 114 t and is 34.7 m long,which adopts a super long platform combination with 3 units in lengthways.Each transportation task is carried on the calculation concerning the speed,highway slope,transition radius etc.All tasks are completed on time and safely.
【Key words】 heavy object transportation; platform trailer; Three Gorges Project;
- 【文献出处】 水力发电 ,Water Power , 编辑部邮箱 ,2005年01期
- 【分类号】TV53
- 【被引频次】5
- 【下载频次】170