五年大开发 水电谱新篇——贵州西电东送工程首批水电项目勘测设计工作回顾
Five-year development and new achievement of hydropower construction:Review of investigation and design for West to East Power Transmission Project
【摘要】 贵州是西电东送工程的主要省份之一,首批4座大型水电站,经过全体建设者五年的团结奋战、艰苦努力,都己经投产发电,中央确定的西电东送工程首期目标如期实现。本院作为贵州西电东送工程的主要单位之一,承担了洪家渡、索风营、引子渡3座水电站的勘测设计工作,为贵州西电东送首批水电项目的建设提供了强有力的技术支撑和服务,做出了自己的贡献。我们在庆贺贵州西电东送工程首批项目成功建设的时候,对本院的勘测设计工作进行回顾和总结是十分必要的。
【Abstract】 Guizhou Province is one of the main provinces for the construction of hydropower stations for the West to East Power Transmission Project.The four large-scale hydropower stations for the first phase of the project have been completed and put into operation,and then the target of the first phase of the project has been realized.As one of the main constructing units for the project,Guiyang Hydropower Investigation Design & Research Institute has undertaken the engineering investigation and design of Hongjiadu,Suofengying and Yinzidu hydropower stations and has supplied the technical supports and services concerned for the hydropower construction of the hydropower stations in the first phase of the project in Guizhou Province with a great contribution.So far as the project is concerned,it is necessary to review and summarize the investigation and design made by our institute.
【Key words】 West to East Power Transmission Project; hydropower project; investigation and design;
- 【文献出处】 水利水电技术 ,Water Resources and Hydropower Engineering , 编辑部邮箱 ,2005年09期
- 【分类号】F426.61;
- 【下载频次】38