The structural characteristic and the principle of the movable scaffolding system(MSS) which is applied to the construction of PC continuous girders at Sutong Bridge are introduced.And the key points to control line shape of the box are analyzed.According to the large transverse tensile stress of the cantilever box floor,some practical methods are brought up for preventing the girder from cracking.