流水作业由二台柔性机器组成时的极小完工时间之和问题
Minimizing Total Completion Time of Jobs on a Flexible Two Machine Flow Shop
【摘要】 该文考虑下述由2台机器组成的流水作业问题:n个相同工件需依相同次序在机器1、2上共进行3次加工.工件j的第一次加工在机器1上进行,所需时间为p1;其第二次加工或单独在机器1上或单独在机器2上进行,当工件j的第二次加工在机器1上进行时,所需时间为p12,当工件j的第二次加工在机器2上进行时,所需时间为p21;其第三次加工需在机器2上进行,所需时间为p2.要求适当安排这n个工件的加工方式以使它们的完工时间之和达到极小.对该问题作者对应不同情况给出了不同的最优解法.
【Abstract】 This paper considers the following scheduling problem on a flow shop composed of two flexible machines: N identical jobs must be processed in the same sequence through a two-machine flow shop. Each job must be processed for a total of three times on both machines. The job is first processed on machine 1 with a processing time p1. It is then processed on machine 1 or 2 for the second time. If it is processed on machine 1, the processing time is p12, while the processing time is p21 if processed on machine 2. Finally, the job is processed for the third time on machine 2 with a processing time p2. A proper sequence of processing is sought such that the total processing time of n jobs is minimized. For such a scheduling problem, different optimal algorithms are constructed corresponding to different cases.
【Key words】 sheduling; flexible flow shop; total processing time; algorithm;
- 【文献出处】 上海大学学报(自然科学版) ,Journal of Shanghai University(Natural Science Edition) , 编辑部邮箱 ,2005年02期
- 【分类号】O223
- 【被引频次】1
- 【下载频次】78