节点文献
高坝洲水电站增容经济分析
Economical Study on Gaobazhou Hydropower Station Capacity Increase
【摘要】 高坝洲水电站在实际运行中存在弃水,为充分利用水能资源可进行适当的机组增容。依据高坝洲水电站水能计算结果,提出了几种可能的增容方案,并进行了经济计算及分析。
【Abstract】 There is surplus water in operation of Gaobazhou hydropower station. In order to make the best use of the water resource, considerable capacity increase can be put in practice. Based on the hydropower computation the author indicates several possible methods, the economical calculation and synthetical analysis are the emphasis in the text, and the author provides valuable reference to the establishment of capacity increase in Gaobazhou hydropower station.
- 【文献出处】 水电能源科学 ,Hydroelectric Energy , 编辑部邮箱 ,2005年02期
- 【分类号】TV7
- 【被引频次】2
- 【下载频次】49