节点文献
福州可门火电厂一期工程码头基桩选型
Selection of Wharf Foundation Pile in the First Stage Project of Kemen Power Plant in Fuzhou
【摘要】 根据福州可门火电厂一期码头工程地质特点,通过对预应力钢筋砼方桩、后张预应力砼大管桩、先张预应力高强管桩(PHC)和钢管桩各桩型技术经济特点的分析,对码头基桩选型进行了论证。
【Abstract】 The selection of wharf foundation pile in the first stage project of Kemen Power Plant in Fuzhou is demonstrated,according to its geologic characteristics and through technical and economical analysis on prestressed reinforced concrete square pile,post-tensioning prestressed concrete cylinder pile,the pre-tensioning prestressed concrete high strength cylinder pile(PHC) and steel cylinder pile.
- 【文献出处】 水道港口 ,Journal of Waterway and Harbor , 编辑部邮箱 ,2005年01期
- 【分类号】U665.5441
- 【下载频次】38