节点文献

高峰矿区100号矿体采空区治理与地压监测研究

Mined-out Area Treatment and Ground Pressure Monitoring for the No.100 Orebody in Gaofeng Mine Section

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 黄应盟邓金灿毛建华叶粤文

【Author】 Huang Yingmeng 1, Deng jincan 1, Mao Jianhua 2, Ye Yuewen 2(1. Guangxi Gaofeng Mining Co. Ltd., Hechi, Guangxi 547205, China;2.Changsha Insttute of Mining Research, Changsha, Hunan 410012, China)

【机构】 广西高峰矿业有限责任公司长沙矿山研究院长沙矿山研究院 广西河池市547205广西河池市547205湖南长沙410012湖南长沙410012

【摘要】 介绍了针对高峰矿区100号矿体特大事故隐患实施的采空区治理工程及其地压监测成果。高峰矿业有限责任公司采取了构筑钢筋混凝土或高强度混凝土隔离层、实施水砂胶结或块石充填和封闭采区等综合治理措施,并建立地表岩层移动观测站和井下地压监测系统,取得了显著成效。

【Abstract】 In Gaofeng mining section, the comprehensive measures was adopted to treat the mined-out area existed in the No.100 Orebody, including building armoured concrete or concrete isolation layers with high strength, filling the mied-out area with cemented sand or waste boulder, sealing the mied-out area, a surface observation station and an underground monitoring system had been built to observe the displacement of strata or monitor ground pressure, resulting in remarkable success.

  • 【文献出处】 矿业研究与开发 ,Mining Research and Development , 编辑部邮箱 ,2005年03期
  • 【分类号】TD853.391
  • 【被引频次】25
  • 【下载频次】209
节点文献中: 

本文链接的文献网络图示:

本文的引文网络