节点文献

娘子关供水二期工程水源泵站基坑排水对泉水的影响

The Influence of the Foundation Ditch Drainage of the Water Source Pump-station of the Niangziguan Second-stage Water-supply Engineering

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王明辉

【Author】 WANG Ming-hui

【机构】 水利部山西水利水电勘测设计研究院 山西太原030024

【摘要】 阳泉市娘子关供水二期工程水源泵站位于娘子关泉域,基坑开挖后地下水集中涌向基坑,附近的五龙泉和石板磨泉泉水受到影响,通过地质调查和抽水试验,提出了可行的施工和封堵方案,工程实施后泉水水位迅速回升,泉域原水文地质条件未发生变化。

【Abstract】 The Water Source Pump-station of the Niangziguan Second-stage Water-supply Engineering is located in the Niangziguan Spring Area of Yangquan City. Because the groundwater poured into the foundation ditch after the excavation of the foundation ditch, the spring water of the Wulong Rpring and the Shibanmo Spring nearby have been influenced. Through the geological investigations and the pumping tests, the practicable schemes for the construction and closing have been put forward, and the back-up of the water-level occurred rapidly after the construction, and the original hydraulic and geological conditions of the spring area have no any change.

  • 【文献出处】 科技情报开发与经济 ,Sci/tech Information Development & Economy , 编辑部邮箱 ,2005年14期
  • 【分类号】TU991.1
  • 【下载频次】37
节点文献中: 

本文链接的文献网络图示:

本文的引文网络