节点文献

华东电网抽水蓄能电站规划与展望

Plans and prospects of pumped-storage power stations in East China Power Grid

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 陈兆庆张建平王峥

【Author】 CHEN Zhao-qing,ZHANG Jian-ping,WANG Zheng (East China Grid,Shanghai 200002,China)

【机构】 华东电网有限公司华东电网有限公司 上海200002上海200002上海200002

【摘要】 以华东电网系统运行成本最优为目标,阐述了华东电网抽水蓄能电站规划研究的最优建设规模。然后根据全网资源优化配置原则,针对华东电网具体情况,考虑电网输送能力和经济性等约束条件,给出了抽水蓄能电站在华东电网范围内的布局思路。在全面总结了近期华东电网抽水蓄能规划研究工作的基础上,对华东电网抽水蓄能建设进行了探讨和展望。

【Abstract】 With the aim of achieving the lowest system operation cost of the East China Power Grid,the optimal capacity of pumped-storage power stations in East China Power Grid is recommended.According to the principle of optimizing resources allocation throughout the Grid and the actual situation of the Grid,the layout plans of pumped-storage power stations in East China Power Grid are given,with consideration of conditions such as network transmission capacity and economy.Summarizing the planning study of pumped-storage power stations in East China Power Grid,the construction of pumped-storage power stations in the Grid is discussed and prospected.

【关键词】 抽水蓄能调峰规划规模布局
【Key words】 pumped-storagepeak regulation plansizelayout
  • 【文献出处】 华东电力 ,East China Electric Power , 编辑部邮箱 ,2005年10期
  • 【分类号】TV743;
  • 【被引频次】7
  • 【下载频次】217
节点文献中: 

本文链接的文献网络图示:

本文的引文网络