钻孔灌注桩桩端后压浆机理及效果检测

Mechanism & Performance Test of Bored Pile with Post Grouting at Base

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李昌驭赵建华许斌吕嘉龚维明

【Author】 LI Chang-yu1, ZHAO Jian-hua1, XU Bin1, LU Jia, GONG Wei-ming2(1. Nanjing Construction and Installation Engineering Quality Test Center, Nanjing, 210007)(2.College of Civil Engineering, Southeast University, Nanjing, 210096)

【机构】 南京市建筑安装工程质量检测中心东南大学土木工程学院

【摘要】 本文分析了传统钻孔灌注桩的工艺缺陷,阐述了后压浆机理,并结合工程实例,对桩端压浆进行了试验研究,分析了后压浆效果。同时指出,几种检测手段综合应用是检测后压浆桩压浆效果的有效方法。

【Abstract】 The technique of post-grouting after construction can both improve the bearing capacity of pile and decrease the pile top subsidence obviously as well as the bearing properties of foundation pile change. The paper reveals working mechanism of post-grouting and showed the performance of post-grouting through introduction of experiments of base-grouting in super-long and big-diameter bored piles conducted in the experimental-pile research project of Su-Tong Bridge across Yangtze River and the effect of grouting is analyzed.

  • 【文献出处】 工程质量 ,Engineering Quality , 编辑部邮箱 ,2005年02期
  • 【分类号】TU753.3
  • 【被引频次】11
  • 【下载频次】143
节点文献中: 

本文链接的文献网络图示:

本文的引文网络