陆家浜路车站北施工区基坑施工

Foundation Pit Excavation in North Construction Area of Lu Jia Bang Road Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 裴烈烽;

【Author】 Pei Liefeng

【机构】 上海隧道股份第一项管部;

【摘要】 上海市轨道交通8号线陆家浜路车站北施工区基坑,在施工过程中遇到周围管线密集、高层建筑的桩基较浅、土层渗透性较弱等难题,通过采取地基加固、半盖挖法施工及信息化施工等技术措施,用较短的工期完成了基坑开挖施工,很好地控制了对基坑周边环境的影响,确保西藏南路交通畅通及林荫大楼等邻近建筑的安全,施工中采取的措施,可供同行参考。

【Abstract】 The construction of the foundation pit in the north construction area of Lu Jia Bang Road Station of Shanghai Rail Transit Line No. 8 faces the following difficulties: dense pipelines, shallow pile depth of the neighboring high-rise building, and lower soil permeability. By adopting technical measures such as foundation consolidation, semi top-down construction, feedback information construction, the foundation pit construction is completed in a tight schedule. Furthermore, the ambient environment is under good control, ensuring smooth traffic of South Xi Zang Road and the safety of the nearby buildings like Linyin Mansion. The adopted measures can be referred for the similar project.

  • 【文献出处】 地下工程与隧道 ,Undergrourd Engineering and Tunmels , 编辑部邮箱 ,2005年03期
  • 【分类号】U231.4
  • 【被引频次】4
  • 【下载频次】108
节点文献中: 

本文链接的文献网络图示:

本文的引文网络