节点文献

电力设计中短路电流的计算机算法

Short-Circuit Currents Calculation Method with Computer for Electric Power Design

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 潘永俊黄国勇张熠张立梅

【Author】 PAN Yong-jun~(1a), HUANG Guo-yong~(1b) , ZHANG Yi~2, ZHANG Li-mei~3(1-Jilin University a-^College of Computer Science and Technology; b-^College of Communication Engineering, Changchun 130012, China;2-East China Electric Power Designing Institute, Shanghai 200063,China;3-^Teaching and Research Section of Automation,Changchun Technical School of Machinery, Changchun 130011,China)

【机构】 吉林大学计算机科学与技术学院吉林大学通信工程学院华东电力设计院电气处长春市机械工业学校自动化教研室 长春130012上海200063长春130011

【摘要】 在电力设计中,电气设备和载流导体的选择必须进行短路电流的计算。针对通常计算短路电流是以手工形式进行的问题,提出了短路电流的计算机算法。该算法根据电力网络特点及同步电机过渡过程理论,采用导纳矩阵法,推导出求解转移阻抗的数学模型,经换算进一步得到电源的运算阻抗,再用插值法查取存入计算机中的相应的运算曲线,以代替人工查“运算曲线数字表”,从而自动实现短路电流的求解,算法简单可行。根据该算法编写的程序,可计算具有1 000个节点、2 000条支路、300台发电机和150个故障点的网络的三相短路电流计算。程序中插值法计算结果的小数点后3~4位有效数字与“运算曲线数字表”一致。对于具有20个节点的小型电力网络系统来说手工计算需要2 d,而通过计算机计算只需10 m in。

【Abstract】 In electric power design, selection of electrical equipment and live conductor must base on the calculation of short-|circuit currents. Commonly, electrical engineers calculate short-|circuit currents by handwork. This paper will be according to characteristic of electric power network and transition process principle of synchronization generator, adopt admittance matrix method to educe mathematics model for transfer impedances solution, electrical engineers obtain power supplys calculating impedance through conversion, and find relevant calculating curve kept in computer by insert value method, take the place of handwork to find "figure table of calculating curve", thereby automatically gained result of short-|circuit currents, so the arithmetic is simply and feasible. By the program designed with above arithmetic, electrical engineers can calculate three-|phase short-|circuit currents with 1 000 nodes, 2000 branches, 300 generators and 150 fault locations. In the program, calculation results effective number will be in accordance with the "figure table of calculating curve". For a small electric power system network with 20 nodes, electrical engineers will need two days by handwork calculation, therewith only in ten minutes by computer.

  • 【文献出处】 吉林大学学报(信息科学版) ,Journal of Changchun Post and Telecommunication Institute , 编辑部邮箱 ,2005年05期
  • 【分类号】TP399
  • 【被引频次】15
  • 【下载频次】629
节点文献中: 

本文链接的文献网络图示:

本文的引文网络