节点文献

明珠线二期施工对环境影响的三维有限元分析

3D FEM Analysis on Surroundings Influence due to the Construction of Transverse Section for Shanghai Stadium Station of Pearl Line PhaseⅡ

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘国彬李志高吴小将

【Author】 LIU Guo-bin , LI Zhi-gao , WU Xiao-jiang(Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China)

【机构】 同济大学地下建筑与工程系同济大学地下建筑与工程系 上海200092上海200092上海200092

【摘要】 以上海地铁明珠线二期上体场站工程的实际施工为背景,对上体场站穿越段施工全过程进行三维有限元分析,动态模拟了施工过程对地铁一号线底板、高架立柱等周围环境的变形影响。得出了一些规律性的认识和有价值的结论,给施工提出了一些有益的建议。

【Abstract】 Based on the background of actual construction of Shanghai stadium station project of pearl line phase Ⅱ, 3D finite element method is used to simulate the whole process of construction of transverse section of the station. The surroundings influence due to the construction is simulated dynamically with the process of construction, and the knowledge of the rule is gained and valuable conclusions are drawn and some helpful suggestions are made for the safe construction.

【关键词】 地铁穿越车站三维有限元
【Key words】 MetroTransverse station3D FEM
  • 【分类号】U231.3
  • 【被引频次】18
  • 【下载频次】144
节点文献中: 

本文链接的文献网络图示:

本文的引文网络