土卡水电站坝后式厂房结构应力及稳定性研究
Study on the stress and stability of house-dam block structure of Tuka hydro-project
【摘要】 土卡水电站厂房为坝后式厂房,大坝和厂房底板联成一体,厂房内部进水口、涡壳、尾水管等空间结构复杂,加之下游尾水位很高,因而受力情况复杂。本文采用数值模拟方法,对土卡水电站厂房坝段整体混凝土结构及重点部位(进水口、涡壳、尾水管)和大坝基础进行了应力应变及稳定性研究。结果表明:坝顶向下游变位最大1.25cm,坝顶沉降最大-1.128cm;地震工况下,坝趾出现-0.818MPa的拉应力,坝踵在工况6下出现拉应力;蓄水工况下,进水口底部、涡壳底部、尾水孔周边均存在极值约为-0.5MPa的拉应力;正常蓄水工况下,坝体的整体强度储备抗滑安全系数为Kc=3.8,满足抗滑稳定性要求。
【Abstract】 The powerhouse of Tuka hydro-project is behind the dam,and the dam and powerhouse form one global structure.Due to the complexity of the spatial structure of the intake,spinal casing and tailwater outlet with high lever of tailwater,the working condition of the dam block is very complex.This paper adopts numerical method to study the stress,displacement and stability of the massive concrete structure including the intake,spinal casing and tailwater outlet and dam foundation.Some conclusions can be drawn as follows:the maximum displacement of the crest along river is up to 1.25 cm while the maximum settlement of the crest is -1.128 cm.In earthquake case,tensile stress which is -0.818 MPa occurs in the toe,and there is tensile stress in the heel only in case 6.And also,there is tensile stress about -0.5 MPa which occurs in the bottom of intake,spinal casing and tailwater outlet.In working case,the anti-slide safety factor is 3.8 and the safety of the dam is satisfied.
【Key words】 numerical simulation; powerhouse; displacement; stress; anti-slide safety factor;
- 【文献出处】 四川建筑科学研究 ,Building Science Research of Sichuan , 编辑部邮箱 ,2005年03期
- 【分类号】TV314
- 【被引频次】3
- 【下载频次】96