节点文献
泵站经济运行中机组投入顺序的模糊优选
Fuzzy Optimization of Unit Turning-on Sequence in the Economic Operation of Pumping Station
【摘要】 由于泵站机组的实际性能与设计值不一致 ,造成在泵站经济运行中对机组开机顺序的选择有一定的困难。采用基于模糊一致矩阵的决策方案优选方法对机组进行选优 ,使泵站的经济运行更符合实际 ,更有效降低泵站的运行能耗。
【Abstract】 The disaccord between the designed and the actual performances of pumping station units can induce difficulties in the decision of unit turning-on sequence in the economic operation of pumping station. The decision schemes optimization method based on Fuzzy consistency matrix is adopted in the optimization of unit turning-on sequence to ensure that the economic operation of pumping station agrees with the actual performance to effectively reduce the operation energy consumption of pumping station.
【关键词】 泵站;
经济运行;
模糊优选;
机组;
【Key words】 pumping station; economic operation; fuzzy optimization; unit;
【Key words】 pumping station; economic operation; fuzzy optimization; unit;
- 【文献出处】 中国农村水利水电 ,China Rural Water and Hydropower , 编辑部邮箱 ,2004年09期
- 【分类号】TV675
- 【被引频次】7
- 【下载频次】64