节点文献

泵站经济运行中机组投入顺序的模糊优选

Fuzzy Optimization of Unit Turning-on Sequence in the Economic Operation of Pumping Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 徐青金明宇吴玉明

【Author】 XU Qing1, JIN Ming-yu2, WU Yu-ming2(1. Automation Institute of State Power Company, Nanjing City 210003; 2. Nanjing Water Planning and Design Institute, Nanjing City 210016)

【机构】 国电自动化研究院南京水利规划设计院南京水利规划设计院 江苏南京210003江苏南京210016江苏南京210016

【摘要】 由于泵站机组的实际性能与设计值不一致 ,造成在泵站经济运行中对机组开机顺序的选择有一定的困难。采用基于模糊一致矩阵的决策方案优选方法对机组进行选优 ,使泵站的经济运行更符合实际 ,更有效降低泵站的运行能耗。

【Abstract】 The disaccord between the designed and the actual performances of pumping station units can induce difficulties in the decision of unit turning-on sequence in the economic operation of pumping station. The decision schemes optimization method based on Fuzzy consistency matrix is adopted in the optimization of unit turning-on sequence to ensure that the economic operation of pumping station agrees with the actual performance to effectively reduce the operation energy consumption of pumping station.

【关键词】 泵站经济运行模糊优选机组
【Key words】 pumping stationeconomic operationfuzzy optimizationunit
  • 【文献出处】 中国农村水利水电 ,China Rural Water and Hydropower , 编辑部邮箱 ,2004年09期
  • 【分类号】TV675
  • 【被引频次】7
  • 【下载频次】64
节点文献中: 

本文链接的文献网络图示:

本文的引文网络