不同开挖工序对连拱隧道中墙的影响
Effects of different excavating sequences on mid-partition of double-arched tunnel
【摘要】 针对筲箕湾连拱隧道的开挖过程进行两种不同工序的模拟计算,计算中墙在两种不同开挖工序下的强度、变形与稳定性,比较不同开挖工序对隧道中墙的影响。结果表明,中墙是连拱隧道最主要的受力构件,非对称开挖容易在中墙上引起较大偏心荷载。根据计算结果来评价开挖工序的优劣,对连拱隧道的开挖过程提出一些建议。
【Abstract】 Simulating computation for Shaojiwan double-arched tunnel about two different excavating sequences is carried out; and pays attention to strength, displacement and stability of effects under two excavating sequences. The results show that the mid-partition is a key load-carrying member; the nonsymmetrical excavating will bring eccentrically loads on the mid-partition easily. From the computing results, this paper evaluates the excavating, and gives some opinions on excavating procedure of double-arched tunnel.
【关键词】 双连拱隧道;
中隔墙;
非对称开挖;
有限元;
模拟计算;
力学性能;
【Key words】 double-arched tunnel; mid-partition; nonsymmetrical excavation; FEM; simulating computation; mechanical property;
【Key words】 double-arched tunnel; mid-partition; nonsymmetrical excavation; FEM; simulating computation; mechanical property;
- 【文献出处】 岩土力学 ,Rock and Soil Mechanics , 编辑部邮箱 ,2004年07期