节点文献
古田溪一级水电站设计洪水复核的研究
Research of checking design flood of Gutianxi Hydropower Station CascadeⅠ
【摘要】 根据1959年建库以来积累的新的水文气象资料和水电站运行记录,对古田溪一级水库入库洪水计算、特大洪水处理、资料代表性分析、频率计算和成果的合理性论证作了比较系统的探讨,保证了一级水电站设计洪水复核成果的准确、可靠,为进一步研究提高汛限水位的可行性打下了扎实的基础.
【Abstract】 It is very needed to check design flood in time, based on the new hydrological data and operation record of the power station and the change of design flood standard after built reservoir in 1959. We have probed the calculation methods of entering reservoir flood, frequency analysis, forecast control etc. The accurate and reliable calculating result of the design flood established solid base for further studying the feasibility of heightening the limiting water level during flood season.
- 【文献出处】 武汉大学学报(工学版) ,Journal of Wuhan University of Hydraulic and Electric Engineering , 编辑部邮箱 ,2004年04期
- 【分类号】TV122.3
- 【下载频次】113