节点文献
多重动态规划法在柘林水电站安全及经济运行中的应用
Application of multiple dynamic programming to safe and economical operation of Zhelin Hydropower Station
【摘要】 针对柘林水电站实际的安全及经济运行问题,采用多重动态规划模型进行模拟并详细介绍求解步骤.通过求解模型获得电站内各台机组在给定日负荷计划下的最佳负荷运行分配方案.实际应用表明,本文方法不仅能有效地解决柘林水电站的安全及经济运行问题,而且能够显著提高电站的管理水平.
【Abstract】 The multiple dynamic programming model was used to simulate the safe and economical operation of the Zhelin Hydropower Station, and the detailed steps for the solution of the model were proposed. The optimal load distribution scheme for the operation of each unit was obtained under the planned daily load. Practices show that the method can not only solve the problem of the safe and economical operation of the station, but also greatly improve the management of the hydropower station.
【关键词】 水电站;
安全经济运行;
动态规划;
多重动态规划;
【Key words】 hydropower station; safe and economic operation, dynamic programming; multiple dynamic programming;
【Key words】 hydropower station; safe and economic operation, dynamic programming; multiple dynamic programming;
- 【文献出处】 水利水电科技进展 ,Advances In Science and Technology of Water Resources , 编辑部邮箱 ,2004年05期
- 【分类号】TV737
- 【被引频次】9
- 【下载频次】176