闸基深厚覆盖层基础处理研究
On Treatment of Thick Overburden under Sluice Foundation
【摘要】 以福堂水电站闸基基础处理为重点 ,介绍了福堂水电站闸基防渗和基础处理的特点 ,以及通过渗流和应力计算所采取的综合基础处理措施 ,并与已建、在建工程进行了比较
【Abstract】 This paper places stress on sluice foundation treatment for Futang Hydroelectric Project & describes characteristics of sluice foundation seepage prevention & foundation treatment.Foundation comprehansive treatment measures taken through seepage flow & stress computation and comparison of these measures with those adopted at hydraulic structures already built and to be built.
【关键词】 闸基;
深覆盖层;
基础处理;
防渗措施;
闸坝式水电站;
【Key words】 sluice foundation; deep overburden; impervious measure; gate-dam type hydropower station;