节点文献

人工湿地中COD、NH4-N去除的研究

The Removal of CODCr and NH4-N in the System of Constructed Wetlands

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王红梅张莹

【Author】 WANG Hong-mei 1,ZHANG Ying 2 (1.Jining Vocational and Technical College,Jining 272122,China;2.Jining Water Supply Group Assemble Co.,Jining 272122,China)

【机构】 济宁职业技术学院济宁供水集团总公司 山东济宁272122山东济宁272122

【摘要】 采用两段表面流人工湿地处理城市污水。污水经AB法处理后 ,再经人工湿地处理。第一段人工湿地水力停留时间 (HRT)为 3d ,COD去除率为 40 %~ 60 % ,NH4 -N的去除率为 5 0 %~ 70 %。第二段人工湿地水力停留时间 (HRT)为 3d ,COD平均去除率大于 5 0 % ,NH4 -N平均去除率大于 90 %。

【Abstract】 The system was consisted of two-stage batch surface flow constructed wetlands treating municipal wastewater. After municipal wastewater was treated by the way of adsorption biodegradation, the wastewater was treated by the system of constructed wetlands. The first -stage constructed wetland was surface flow. After 3 days of HRT ,COD Cr removal varied from 40% to 60%,NH 4-N removal varied from 50%~70%.The second-stage constructed wetland was also surface flow. After 3 days of HRT ,COD Cr average removal exceeded 50%,NH 4-N average removal exceeded 90%.

【关键词】 废水处理人工湿地COD
【Key words】 wastewater treatmentcontructed wetlandCOD
  • 【文献出处】 山东化工 ,Shandong Chemical Industry , 编辑部邮箱 ,2004年04期
  • 【分类号】X799.303
  • 【被引频次】20
  • 【下载频次】541
节点文献中: 

本文链接的文献网络图示:

本文的引文网络