节点文献

斜拉桥П形截面PC主梁剪力滞模型试验研究

Model Test and Study of Shear Lag of Prestressed Concrete Main Girder of Cable-Stayed Bridge with П-shape Cross Section

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李乔唐亮黄道全万臻

【Author】 LI Qiao~1, TANG Liang~1, HUANG Dao-quan~2, WAN Zhen~1 (1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China; 2. Sichuan Highway Survey and Design Institute, Chengdu 610041, China)

【机构】 西南交通大学土木学院四川省公路勘察设计院西南交通大学土木学院 四川成都610031四川成都610031四川成都610041四川成都610031

【摘要】 采用大尺度预应力混凝土模型试验,研究斜拉桥在自重、竖向力、预应力和斜拉索拉力等作用下П形截面主梁剪力滞效应。试验结果表明,该种截面斜拉桥主梁剪力滞后现象不可忽视,并且梁中既有正剪力滞又有负剪力滞,各种外力的影响也不尽相同。

【Abstract】 By means of model test of a large scale prestressed concrete (PC) beam, this paper studies the shear lag effect of the PC main girder of a cable stayed bridge with П-shape cross section under self weight of the bridge structure, external vertical loads, prestressing force and stay cable forces. The test and study results indicate that the shear lag effect in the kind of girder cannot be neglected, the shear lag in the girder is both positive and negative, and the rules of the shear lag caused by different external loads are not always the same.

  • 【文献出处】 桥梁建设 ,Bridge Construction , 编辑部邮箱 ,2004年05期
  • 【分类号】U446
  • 【被引频次】21
  • 【下载频次】317
节点文献中: 

本文链接的文献网络图示:

本文的引文网络