节点文献

秦山三期核电工程1号反应堆基岩固结灌浆

Consolidation grouting for bed rock of unit one reactor in the third phase of Qinshan nuclear power engineering

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李婕何大坤顿志林

【Author】 LI Jie~1, HE Da-kun~2, DUN Zhi-lin~1 (1.Dept.of Civil Eng.& Arch.of HPU, Jiaozuo 454010,China; 2.Constructional Engineering Supervision Agency of HPU, Jiaozuo 454159, China)

【机构】 河南理工大学土木建筑工程系河南理工大学建设工程监理所河南理工大学土木建筑工程系 河南焦作 454010河南焦作 454010河南焦作 454010

【摘要】 灌浆压力是控制灌浆过程的重要参数之一.在秦山三期核电工程1号反应堆基岩进行固结灌浆过程中,应用GIN灌浆法对灌浆全过程进行动态监控,收到较好的效果,值得推广.灌浆结果表明,固结灌浆提高了基岩的整体稳定性.

【Abstract】 Grouting pressure is one of the important parameters. When consolidation grouting was performed for bed rock of unit one reactor in plase Ⅲ of Qinshan nuclear power engineering, the GIN method was used to dynamically monitor and control the grouting process. The grouting effect is remarkable and the method should be popularized. The grouting results indicate that the consolidation grouting can increase the whole stability of bed rock.

【关键词】 基岩固结灌浆灌浆压力GIN曲线
【Key words】 bed rockconsolidation groutinggrouting pressureGIN curve
  • 【文献出处】 焦作工学院学报(自然科学版) ,Journal of Jiaozuo Institute of Technology , 编辑部邮箱 ,2004年05期
  • 【分类号】TU472.6
  • 【下载频次】45
节点文献中: 

本文链接的文献网络图示:

本文的引文网络