节点文献
混凝土管桩在昆明8度抗震区的设计和应用
Design and Application of R.C. Tubular Pile in 8 Degree Seismic Fortication Intensity Region in Kunming
【摘要】 简要介绍了在昆明“湖畔之梦”工程中引进混凝土管桩所面临的问题。结合与预制方桩的比较 ,针对昆明 8度抗震设防及滇池湖畔饱和非均匀性软土地基薄壁管桩 (PTC)桩基抗震进行了专门验算。为解决地方标准 (如浙江、宁波标准 )对高烈度区限制管桩应用问题进行了探索与尝试 ,提出了相关设计建议。
【Abstract】 The superiority of reinforced spun concrete tubular pile and the problems are introduced, which appear in project“the dream of Hupan”in Kunming.Comparing with the precast concrete square pile, the aseismatic intensity checking computations is made for the featheredged concrete tubular pile applied in the heterogeneous soft foundation near the Dianchi Lake at the 8 degree seismic fortification intensity.The problems of the first application for the concrete tubular pile in some high intensity regions restricted by some local standards(such as Zhejiang standard)are tried to solve.
【Key words】 reinforced spun concrete tubular pile; the horizontal bearing; soft foundation; aseismatic design;
- 【文献出处】 建筑结构 ,Building Structure , 编辑部邮箱 ,2004年04期
- 【分类号】TU473.1
- 【被引频次】14
- 【下载频次】184