节点文献
Optimal operation of cascaded hydroelectric power plants in the power market
【Abstract】 An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants.
【Key words】 cascaded hydroelectric power plants; network flow; market clearing price;
- 【文献出处】 Journal of Harbin Institute of Technology ,哈尔滨工业大学学报(英文版) , 编辑部邮箱 ,2004年06期
- 【分类号】TV73
- 【下载频次】38