节点文献
澳门综合体育馆钢屋盖次桁架安装方案及分析
THE INSTALLATION SCHEME AND ANALYSIS OF SECONDARY TRUSSES OF STEEL ROOF IN MACAO GYM
【摘要】 首先分析了澳门综合体育馆屋盖钢结构主桁架和次桁架的受力关系 ,据此确定了次桁架的安装方案 ,并对安装过程中主次桁架的内力、变形及支座反力做了全过程跟踪计算分析 ,验证了安装方案及后续桁架对接的可行性。最后根据桩基的沉降试验数据 ,计算了支座反力及沉降量对整体结构性能的影响 ,验算了结构在产生不均匀沉降状态下的安全性。
【Abstract】 The installation scheme and analysis procedure of the steel roof of Macao Gym are presented. First, the interaction between main and secondary trusses in the roof is analyzed to identify their individual contributions to ap plied loading. Based on the results obtained above, the installation approach an d steps of the secondary trusses is determined. Then the internal forces, deform ation and support reaction in the trusses are traced and calculated during full construction process. The obtained results verify the applicability of the insta llation approach, and the joining gap between main and secondary trusses is suit able. Finally, according to the data provided from piling settlement experiment, the effect of the reaction and settlement on the steel roof structure performan ce is determined and the roof safety in the state of uneven settlement is chec ked.
【Key words】 secondary trusses deformation support reaction uneven settlement;
- 【文献出处】 工业建筑 ,Industrial Construction , 编辑部邮箱 ,2004年12期
- 【分类号】TU758
- 【被引频次】12
- 【下载频次】185