配125MW机组锅炉技术改造的研究

The Study on Technical Retrofit for 125MW Grade Boiler Air Preheater

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 赵伶玲周强泰何慕春王跃张元生丁浩

【Author】 ZHAO Ling-ling 1, ZHOU Qiang-tai 1, HE Mu-chun 1, WANG Yue 2, ZHANG Yuan-sheng 2, DING Hao 2 (1. Power Department of Southeast University, Nanjing 210096, China; 2. Huang Dao Power Plant, Qingdao 266500, China)

【机构】 东南大学动力工程系黄岛发电厂黄岛发电厂 江苏南京210096江苏南京210096山东青岛266500山东青岛266500

【摘要】 论述了锅炉热风温度偏低 ,排烟温度偏高的原因 ,研究分析了各种可能的改造方案 ,介绍了黄岛发电厂锅炉管式空气预热器采用螺旋槽管及回转式空气预热器波形板的改造方案 ,给出了改造后的试验结果。

【Abstract】 The reason why the temperature of the heated air and the exit flue gas for the 125MW grade boiler deviated severely from the design value was discussed in this paper. The possible plans for the boiler retrofit to solve the problems were analysed. The plan for the retrofits of the tube-type and the rotary type air preheaters for Huang Dao Power Plant was mentioned. The test results before and after retrofit were given.

  • 【分类号】TK229
  • 【被引频次】1
  • 【下载频次】80
节点文献中: 

本文链接的文献网络图示:

本文的引文网络