节点文献

变电站综合自动化系统远动装置的自动切换

Realizing Twin - auto - switch of the Remove - control Device in Synthesis Automatization System

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王素杰

【Author】 Guang - Dian Power Grid Group Co. Ltd. Guangzhou Power Supply Branch Wang Su Jie

【机构】 广电集团广州供电分公司

【摘要】 变电站综合自动化系统在电力生产中扮演着重要角色,是电网调度自动化的基础和信息源之一,信息的正确采集,预处理,可靠的流动以及合理的利用是我们的工作目标。远动装置从人工切换改进为自动切换,提高了电网运行的可靠性、安全性。本文介绍了220kV嘉禾变电站CSC2000综合自动化系统CSM300C远动装置双机自动切换的实现方式。

【Abstract】 The substation synthesis automatization System takes an important part in electric power production being the base of network dispatch automatization & one of the information sources. Our work - aim is collecting correctly, pretreatment, following reliably and using reasonably of the information. As the remove - control device has been improved from manpower switch to auto switch, so that the operation reliability and safety of the powemetwork also have been raised. In this paper the author introduced how to realize twin - auto - switch of CSM300C remove - control device in CSC2000 synthesis automatization system of Jia He substation.

  • 【文献出处】 广东输电与变电技术 ,Guangdong Power Transmission Technolo , 编辑部邮箱 ,2004年02期
  • 【分类号】TM76
  • 【被引频次】1
  • 【下载频次】72
节点文献中: 

本文链接的文献网络图示:

本文的引文网络