节点文献
三峡至广东500kV线路广东侧直流换流站外绝缘爬电比距参考盐密的确定
Determination of specific creepage distance and equivalent salt deposit density of external insulation for Guangdong-side converter station of 500 kV DC line from the Three Gorges to Guangdong
【摘要】 三峡至广东 50 0kV直流输电线路的设备外绝缘水平是工程建设的基本问题之一 ,因此对广东侧直流换流站站址所在区域的污秽状况进行了调查。通过分析该换流站站址区域的主要废气排放量、大气环境质量、气象状况和主要污染源的情况 ,确定了该换流站的交、直流污秽等级 ,以及在相应污秽等级下的参考盐密和爬电比距
【Abstract】 The equipment external insulation level of 500 kV DC transmission line from the Three Gorges to Guangdong is a basic consideration in the project, and an investigation was made into the pollution condition on the location for its Guangdong-side converter station. By analyzing the exhaust emissions, atmospheric and environmental quality, weather and major pollutant sources on the location, the AC/DC pollution grade of the converter station is determined along with corresponding specific creepage distance and equivalent salt deposit density (ESDD).
【关键词】 西电东送;
直流换流站;
外绝缘;
污秽;
参考盐密;
【Key words】 power transmission from West China to East China; DC converter station; external insulation; pollution; ESDD;
【Key words】 power transmission from West China to East China; DC converter station; external insulation; pollution; ESDD;
- 【文献出处】 广东电力 ,Guangdong Electric Power , 编辑部邮箱 ,2004年03期
- 【分类号】TM852
- 【下载频次】108