节点文献

受水利工程影响水文站输沙率间测方案探讨

On the indirect measurement of hydrology station’s silt discharge under the influence of irrigation works

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 文小平韩学军陈杰

【Author】 WEN Xiao-ping;HAN Xue-jun;CHEN Jie Shaoguan Branch, Guandong Hydrology Bureau, Shaoguan 512026, China

【机构】 广东省水文局韶关分局广东省水文局韶关分局 广东韶关 512026广东韶关 512026广东韶关 512026

【摘要】 本文以高道站受飞来峡水利枢纽建成前后的输沙率间测资料分析为例,试图探求一种既能保证输沙测验精度、不受测站特性变化影响,又能简化测验流程、提高工作效率的测验方法。

【Abstract】 Attempts were made to acquire a measurement method which, on one hand, can guaranteethe measurement accuracy of sediment transport and resist the influence of measurement station’svariation in property, on the other hand, can simplify the process of measurement to raise theoperational efficiency. We take Gaodao Station as a case in point, making use of the material ofindirect measurement of its silt discharge under the influence of Feilai Gorge Hydrology Junctionaround the time when the junction was built.

  • 【文献出处】 佛山科学技术学院学报(自然科学版) ,Journal of Foshan University(Natural Science Edition) , 编辑部邮箱 ,2004年02期
  • 【分类号】P332.5
  • 【被引频次】1
  • 【下载频次】32
节点文献中: 

本文链接的文献网络图示:

本文的引文网络