【摘要】 针对岭澳核电站 10 0 0MW机组电气系统组成的特点 ,从分析各单项调试程序的内容与接口关系入手 ,并吸取大亚湾核电站电气整套启动试验的经验和教训 ,制定了一套完整的电气整套启动试验方案。试验首次由中方人员担任总指挥及各单系统试验负责人 ,成功地完成了岭澳核电站 2台发电机组的电气整套启动试验 ,创造了巨大的经济和社会效益

【Abstract】 A complete set of test scheme for start-up of electric system has been worked out based on features of electric system composition of 1 000 MW unit in Lingao Nuclear power station, analysis on contents of all individual test procedures and relation to interfaces and absorption of experiences and lessons from start-up test of the complete electric system in Daya Bay Nuclear power station. The Chinese persons were first assigned to be the general commander and responsible for the test of individual system, who have successfully completed the whole electric test for 2 units of the station and created significant economic and social benefits.[

  • 【文献出处】 电力建设 ,Electric Power Construction , 编辑部邮箱 ,2004年07期
  • 【分类号】TM623.4
  • 【被引频次】1
  • 【下载频次】89
节点文献中: 

本文链接的文献网络图示:

本文的引文网络