施工进度的风险分析
Analysis of construction schedule risk
【摘要】 承包商承包工程有一定的风险,成本、进度和质量是工程项目中的三个主要变数,而施工进度是最敏感,包括很多不确定性因素。文章介绍了风险源、风险估计及风险的评价方法。
【Abstract】 The contractor contracting the project has a certain risk. The cost, The rate of progress and the quality have three main variables in the project, the progress rate of construction is susceptiblest, it includes many uncertain factors. The paper introduces the source of risk, the assessment of risk and the evaluation method of risk.