节点文献
黑河龙首水电站短期优化调度研究
SHORT-TERM OPTIMAL OPERATION OF LONGSHOU HYDROPOWER STATION ON HEIHE RIVER
【摘要】 为了充分发挥黑河龙首水电站的水能利用率,对龙首水电站的短期优化调度进行了研究。通过对5个典型年短期优化调度模型求解结果进行回归分析,获得各月的短期调度规则,对调度规则的验证结果表明相对误差较小,所得到的短期调度规则可以投入实际应用。
【Abstract】 The short-term optimal operation of Longshou Hydropower Station on the Heihe River is studied for the improvement of its water-power utilization efficiency. The runoff processes for 5 typical years are selected for optimization of short-term operation. The results are regressively analyzed and monthly scheduling rules are obtained. Then the check analysis shows that the relative error of scheduling rules is small, indicating that the scheduling rules can be applied to operation.
【关键词】 水利管理;
优化调度;
调度规则;
回归分析;
水电站;
【Key words】 water management; optimized scheduling; scheduling rule; regression analysis; hydropower station;
【Key words】 water management; optimized scheduling; scheduling rule; regression analysis; hydropower station;
【基金】 国家重点基础研究专项经费资助项目(G1999043608);国家自然科学基金(50079021);中华电力教育基金;陕西省重点实验室项目(02JS37)
- 【文献出处】 水电自动化与大坝监测 ,Dam Observation and Geotechnical Tests , 编辑部邮箱 ,2004年02期
- 【分类号】TV736;TM73
- 【被引频次】2
- 【下载频次】124