【摘要】 对黄河上游李家峡水电站强震安全监测台阵布设的技术方案进行了详细阐述,内容包括场地的工程概况、台站场址的地址条件、台站的设计、仪器的性能指标及现场施工的具体情况、数据的采集分析等,可供其他大坝强震监测台阵设计时参考。
【Abstract】 The technical schemes of the strong earthquake monitoring station of Lijiaxia Hydropower Station, which is located on the upper reaches of the Yellows River, are illustrated in detail, including the general situation of the project, the geologic structure near the monitoring station, the design of the monitoring station, the performance indexes of the apparatus, the condition of the construction location, data acquisition and analysis, etc.
【关键词】 强震监测;
水电站;
拱坝;
台阵;
【Key words】 strong earthquake monitoring; hydropower station; arch dam; station;