大型建筑物不均匀沉降机理及处置策略——湿陷性黄土地基环境
Non-uniform settlement of large-scale building on collapsible loess ground and its treatment strategy
【摘要】 对湿陷性黄土地基环境下大型建筑物不均匀沉降机理进行了深入分析,提出了"旋喷桩加固法"处理该类地基事故的策略,详细分析了地基产生不均匀沉降的成因,对地基处理设计、施工参数确定及施工控制等进行了讨论。实际应用表明,采用该方法处理由多因素造成的地基事故,是一种行之有效的方法。
【Abstract】 The mechanism of nonuniform settlement of largescale building with collapsible loess ground was deeply analyzed and its treatment strategy was presented in this paper. The chemical churning pile, as a suitable method, was used to deal with such ground accident. The authors analyzed the cause of formation of nonuniform ground settlement, discussed the factors of foundation design and construction control. Practice shows that the chemical churning pile is an effective way to deal with similar ground settlement accident caused by multifactor.
【关键词】 旋喷桩;
地基加固;
湿陷性黄土;
【Key words】 chemical churning pile; ground strengthening; collapsible loess;
【Key words】 chemical churning pile; ground strengthening; collapsible loess;
【基金】 国家西部交通建设科技攻关项目(200131800021)
- 【文献出处】 自然灾害学报 ,Journal of Natural Disasters , 编辑部邮箱 ,2003年04期
- 【分类号】TU433
- 【被引频次】19
- 【下载频次】251