节点文献
谢叠大桥9号墩桩基和盖梁加固设计与施工监控
Strengthening Design and Construction Monitoring of The Pile Foundation and Pier Coping of No.9 Pier of Xiedie Bridge
【摘要】 介绍桩基主动托换加固和盖梁加固的主要设计构思、施工工艺流程及施工监控的主要内容。
【Abstract】 This article introduces the design considerations for pile foundation reinforcement by active underpinning and pier coping reinforcement, and the corresponding construction technological flow and construction monitoring.
【关键词】 桩基;
裂缝;
主动加固;
托换;
顶升;
施工监控;
【Key words】 pile foundation; crack; active strengthening; underpinning; lift-up; construction monitoring;
【Key words】 pile foundation; crack; active strengthening; underpinning; lift-up; construction monitoring;
- 【文献出处】 有色冶金设计与研究 ,Nonferrous Metals Engineering & Research , 编辑部邮箱 ,2003年03期
- 【分类号】U445.7
- 【被引频次】1
- 【下载频次】70