节点文献
深基坑土钉支护分层开挖高度的确定
Determination on each excavation height of soil nailing support for foundation pit
【摘要】 给出了基坑边坡在无支撑自由状态下首层开挖高度的统一计算公式 ,提出了综合影响修正系数 .根据待开挖层和已开挖土体本身的力学强度以及已开挖土体的支护强度 ,采用平滑破裂面模式极限平衡分析方法 ,给出了下一步开挖高度的计算公式 .通过实例说明了其计算过程
【Abstract】 A calculation formula of the first excavation height for foundation pit is given under no supporting,and the synthetic influence coefficient is suggested.Accord ing to the mechanics strength of excavating soil strata and the supported streng th of excavated soil strata , a calculation formula of the next excavation heigh t is given by the limit analysis of plane sliding model.The calculation process is introduced by a project example.
【关键词】 深基坑;
土钉支护;
开挖;
高度;
【Key words】 deep foundation pit; soil nailing support; excavation; h eight;
【Key words】 deep foundation pit; soil nailing support; excavation; h eight;
- 【文献出处】 武汉化工学院学报 ,Journal of Wuhan Institute of Chemical Technology , 编辑部邮箱 ,2003年03期
- 【分类号】TU753
- 【被引频次】3
- 【下载频次】82