节点文献
露天矿生产计划问题
Production scheduling of open-pit mines
【摘要】 在基于 T.B.Johnson提出的编制露天矿的生产进度计划 Johnson模型的基础上 ,着重论述用综合集合法、CPM网络和目标规划法的近似模型来解该生产进度计划问题的最新算法、编程及应用
【Abstract】 On the basis of the model for production scheduling of open pit mines proposed by T.B.Johnson, the worldwide famous mining professor and mathematician, this pa per, with laying stress on combination of the aggregating algorithm, CPM network and goal programming, presents a varied approximate method for solving this pro duction scheduling problem. The concerning algorithms, programming explanation a nd applications are involved.
【基金】 湖北省教育厅科学计划项目 2 0 0 2 A2 0 0 1 6
- 【文献出处】 武汉化工学院学报 ,Journal of Wuhan Institute of Chemical Technology , 编辑部邮箱 ,2003年03期
- 【分类号】TD802
- 【被引频次】9
- 【下载频次】113